# S00 Sprint Spec Package - v2 Rewire Spec Freeze
Status: SUPERSEDED (2026-07-13); do not transfer this historical draft into active plans Date: 2026-02-18 Working directory: docs/modules/ui/v2-rewire Canonical source: source-of-truth.md, authority-matrix.md, multi-sprint-plan.md
Use the current program and source pointers in the directory currency notice.
Sprint identity seed
Recommended target filename when write scope includes docs/implplan:
SPRINT_20260218_001_DOCS_ui_v2_rewire_spec_freeze.md
Topic and scope
- Freeze unresolved IA and ownership decisions so implementation sprints do not fork behavior.
- Produce authoritative specs for unresolved
Advisory Sources, nav rendering policy, trust ownership transition, and route deprecation baseline. - Establish a first complete endpoint contract ledger covering all root domains.
- Working directory:
docs/modules/ui/v2-rewire(planning docs only). - Expected evidence: signed decision records, canonical mapping tables, completed contract ledger v1.
Dependencies and concurrency
- Upstream: none.
- Downstream blocked by incomplete S00 decisions: S01, S02, S03.
- Safe parallelism inside S00:
- T01 and T02 can run in parallel.
- T03 depends on T01 and T02 outputs.
- T04 can run in parallel with T01/T02.
- T05 starts after T01-T04 freeze points are approved.
Documentation prerequisites
Must be read before any task enters DOING:
docs/modules/ui/v2-rewire/source-of-truth.mddocs/modules/ui/v2-rewire/authority-matrix.mddocs/modules/ui/v2-rewire/sprint-planning-guide.mddocs/modules/ui/v2-rewire/multi-sprint-plan.mddocs/modules/ui/v2-rewire/pack-19.mddocs/modules/ui/v2-rewire/pack-20.mddocs/modules/ui/v2-rewire/pack-21.md
Delivery tracker
S00-T01 - Security and Risk Advisory Sources final spec
Status: TODO Dependency: none Owners: Product Manager, Documentation Author Task description:
- Define full screen-level specification for
Security and Risk -> Advisory Sources, including navigation entry, filters, primary data objects, decision impact fields, and drilldown links to Integrations and Platform Ops. - Resolve the split contract between advisory connectivity/freshness ownership and release-gating interpretation ownership.
- Produce concrete UI behavior for stale, unavailable, and conflicting advisory-source states.
Completion criteria:
- [ ] Canonical screen definition exists with sections: purpose, layout, primary actions, empty/error states, and deep links.
- [ ] Ownership boundary is explicit for each field on the screen (
Security and Risk,Integrations,Platform Ops). - [ ] Required backend contract list exists for this screen with preliminary status (
EXISTS_COMPAT/EXISTS_ADAPT/MISSING_NEW). - [ ] Source references cite canonical files and authoritative pack sections.
S00-T02 - Release Control capability rendering policy
Status: TODO Dependency: none Owners: Project Manager, UX Lead Task description:
- Freeze navigation rendering rule for Release Control-owned capabilities (
Releases,Approvals,Deployments,Regions and Environments,Bundles):- either direct root shortcuts + domain ownership,
- or strictly nested navigation under
Release Control.
- Define one allowed rendering pattern for desktop and mobile nav.
Completion criteria:
- [ ] One rendering policy selected and documented, including rationale and migration impact.
- [ ] Breadcrumb and route naming convention for selected policy is documented.
- [ ] Policy includes explicit do/do-not guidance to prevent mixed rendering in downstream sprints.
- [ ] Policy references route migration obligations captured in S00-T04.
S00-T03 - Trust and signing ownership transition policy
Status: TODO Dependency: S00-T01, S00-T02 Owners: Product Manager, Security Architect, Documentation Author Task description:
- Finalize ownership transition where
AdministrationownsTrust and SigningwhileEvidence and AuditandSecurity and Riskconsume trust state. - Define canonical link model, breadcrumbs, and allowed alias behavior during migration.
Completion criteria:
- [ ] Ownership statement is explicit and unambiguous.
- [ ] Allowed cross-links from
Evidence and AuditandSecurity and Riskare defined by page. - [ ] Legacy route behavior is specified (
redirect,alias, ordeprecated) with timelines. - [ ] Auth scope impact and role expectations are documented.
S00-T04 - Route deprecation baseline map
Status: TODO Dependency: none Owners: Project Manager, Frontend Lead Task description:
- Build baseline route map from current routing to target IA naming and ownership.
- Include historical aliases and required compatibility redirects.
Completion criteria:
- [ ] Route map covers all root domains and major child routes.
- [ ] Every legacy route has exactly one mapped target action (
keep,redirect,alias,remove-later). - [ ] Risk list exists for high-churn routes and deep links.
- [ ] Deprecation map references the selected nav rendering policy from S00-T02.
S00-T05 - Endpoint contract ledger bootstrap (v1)
Status: TODO Dependency: S00-T01, S00-T02, S00-T03, S00-T04 Owners: Project Manager, API Architect, Module Leads Task description:
- Produce contract ledger v1 across all root domains using the canonical template in
S00_contract_ledger_template.md. - Classify each screen/API dependency as
EXISTS_COMPAT,EXISTS_ADAPT, orMISSING_NEW.
Completion criteria:
- [ ] Ledger includes every root domain and all screens identified as active authority in
authority-matrix.md. - [ ] Every row includes owner module, auth scope impact, and schema delta notes.
- [ ]
MISSING_NEWrows include explicit proposed endpoint and schema action item. - [ ] Ledger reviewed by frontend and backend owners.
S00-T06 - S00 sign-off and handoff packet
Status: TODO Dependency: S00-T01, S00-T02, S00-T03, S00-T04, S00-T05 Owners: Project Manager Task description:
- Compile decision outputs and publish an implementation-ready handoff packet for S01-S03.
Completion criteria:
- [ ] Final S00 summary includes frozen decisions, unresolved risks, and downstream constraints.
- [ ] Handoff packet links all approved artifacts and identifies owners for S01, S02, S03.
- [ ] All S00 tasks are either DONE or explicitly BLOCKED with mitigation.
Acceptance gate (sprint-level)
S00 is considered DONE only if all checks pass:
- [ ] Advisory Sources final spec completed and approved.
- [ ] Release Control rendering policy frozen and approved.
- [ ] Trust ownership transition policy frozen and approved.
- [ ] Route deprecation baseline map completed.
- [ ] Endpoint contract ledger v1 completed with zero unclassified rows.
- [ ] Handoff packet published for S01-S03.
Execution log
| Date (UTC) | Update | Owner |
|---|---|---|
| 2026-02-18 | S00 package drafted in v2-rewire directory for transfer into implplan sprint workflow. | Project Manager |
Decisions and risks
- Risk: unresolved nav rendering decisions can cause parallel implementation divergence; mitigate via mandatory S00-T02 freeze before S01 merge windows.
- Risk: trust ownership transition can break existing deep links; mitigate with explicit alias policy and deprecation calendar.
- Risk: missing backend contracts may be underestimated; mitigate by requiring v1 ledger coverage before implementation sprint kickoff.
- Risk: Advisory Sources boundary ambiguity can duplicate logic across Security, Integrations, and Ops; mitigate via field-level ownership matrix.
Next checkpoints
- Checkpoint 1: S00-T01 and S00-T02 draft completion review.
- Checkpoint 2: S00-T03 and S00-T04 policy review and sign-off.
- Checkpoint 3: S00-T05 ledger review with module leads.
- Checkpoint 4: S00-T06 handoff publication and S01-S03 planning launch.
Artifacts to produce in this directory
S00_advisory_sources_spec.mdS00_nav_rendering_policy.mdS00_trust_ownership_transition.mdS00_route_deprecation_map.mdS00_endpoint_contract_ledger_v1.mdS00_handoff_packet.md