# UI v2 Rewire (Historical Planning Set)

Currency notice (2026-07-13): SUPERSEDED FOR CURRENT UI AUTHORITY. Every file in this directory is retained as historical planning or point-in-time verification, including files whose embedded February/March status says Active, Canonical, or PASS. Do not derive current navigation, routes, roles, or scope gates from this pack. Use the current UI architecture, navigation source and forcing specification, router catalog and route inventory check, Web route/scope mapping, Web scope mirror, and the canonical Authority scope catalog. The current documentation program owns final synchronization. Raw packs and frozen S00/readiness records remain unchanged.

This directory contains two things:

These were the planning entrypoints for the v2 rewire:

S00 package files:

Precedence policy

This planning set uses a strict rule: for overlapping decisions, higher pack number wins.

A higher pack that does not define a screen in detail does not erase the latest lower-pack detail for that screen.

Raw materials

Raw packs are preserved as historical input and should not be used directly as the source of truth for sprint planning:

Planning rule

For historical traceability, a sprint that references this redesign should cite:

  1. The canonical file (source-of-truth.md and/or authority-matrix.md), and
  2. The authoritative pack section listed there.